McCarthy
San Francisco, CA
$693k
The Creative Arts building is a new addition to the San Francisco State University campus, and Casey-Fogli will be pouring the pedestrian walkways around the building, complete with stairs, seat walls, retaining walls, and installing the benches, bike racks, bollards, and skate deterrents.
Featured for site concrete as well, Casey-Fogli also helped construct the new multi-level Creative Arts building itself. Our team pumped, placed, and finished the building’s bottom slab-on-grade and then poured the next three slabs on metal deck and rooftop. The slabs on metal deck had sections with polished concrete, where we achieved a FF 45 tolerance.